Advanced Gait &
Motion Analysis System
GAITMAXIMA is an advanced computer-assisted gait and movement assessment system developed to provide objective, quantitative and clinically useful insights into human locomotion and movement. Designed for modern physiotherapy, rehabilitation, sports medicine, medical education and research environments, the system brings structured movement assessment and professional reporting into a single clinical environment.
It supports assessment of gait characteristics, temporal and spatial parameters, movement patterns and range-of-motion measurements, while enabling bilateral comparison and session-based monitoring. GAITMAXIMA is designed to complement professional clinical judgement with clear, measurable movement information.
A clinical interface built around movement data.
Assessment information can be presented through a structured visual environment for movement review, measurement and reporting.
Gait parameters at a glance.
GAITMAXIMA organizes measurable gait information into practical groups for assessment and comparison.
Spatial Parameters
Gait Cycle
Comparative Review
* Sample values and graphics on this page are illustrative website data only. They are not clinical reference ranges and do not represent an actual patient record.
Gait analysis presented as a complete movement view.
Assessment can bring together gait-cycle events, temporal measurements, spatial measurements and bilateral comparison so that professionals can review movement in a structured visual environment.
* Displayed values are illustrative sample data for website presentation.
Joint movement represented clearly.
The assessment environment can present supported joint and body-segment movement with measurable angles and range-of-motion information, helping professionals document movement characteristics and compare assessments over time.
* Sample measurements are illustrative website data only and are not clinical reference ranges or actual patient records.
Professional reports for assessment, comparison and follow-up.
GAITMAXIMA presents assessment findings in a structured report format designed for clear review, documentation and follow-up. Key measurements and comparative findings can be organized to support professional clinical communication and longitudinal assessment.
* Sample/illustrative reports shown for website demonstration only. They are not actual patient records, diagnostic reports or validated reference reports.
A focused clinical setup for movement assessment.
GAITMAXIMA is designed for professional clinical and rehabilitation environments, with a practical assessment area that supports consistent movement observation, measurement and reporting. A 2–3 camera configuration can be arranged around the walking space and workstation according to the assessment setting.
Objective
Measurable movement information to complement professional observation.
Quantitative
Structured gait parameters and movement measurements for review.
Comparative
Bilateral and session-based comparison where supported.
Reportable
Organized assessment documentation for clinical communication.
Indian innovation.
Global ambition.
GAITMAXIMA is developed and manufactured by Elite Equipments in India, with a focus on advanced movement assessment for healthcare, rehabilitation, education, sports and research.
Experience GAITMAXIMA in your clinical environment.
For product information, demonstrations and institutional enquiries.
REQUEST A DEMO → info@gaitmaxima.com